Broadway High School

Net-Zero Multi-Purpose Building

The new multi-use building includes a large, roof-mounted photovoltaic array, natural daylighting, operable windows, recycled blue jean insulation, polished concrete floors, recycled glass tile, recycled paper resin paneling, low-water consumption fixtures, a bio-swale and previous pavements to eliminate water flow to storm drains. This project was submitted for LEED Gold Certification. Artik also completed the Broadway High School modular campus in 2000. The renovations included a new main office, student services center, and daycare facility, as well as a custom fence surrounding the campus. Students were engaged in the design of the school sign, resulting in a sense of pride and ownership among student body